Stevedores requirements

Stevedores requirements

Normally two men are required to assist on each truckloader at any one time, which in practice will involve from eight to twelve stevedores at any time, together with appropriate foremen and team supervisor, or as required by local practice. The B/I/B/O system needs only a limited involvement from local stevedores. Normally two men are required to assist on each truckloader at any one time, which in practice will involve from eight to twelve stevedores at any time, together with appropriate foremen and team supervisor, or as required by local practice.

The B/I/B/O system is highly flexible, and in addition to these basic discharge options, various combinations designed to suit individual receivers are possible. The operators are always ready to discuss any particular requirements to find an optimal solution, including evaluation of ports, warehouses and transport logistics.